The Chameleon FinanceIowa Department of Transportation used controlled explosives Sunday to remove the remaining parts of the old I-74 bridge, which connects Iowa and Illinois over the Mississippi River.
Certain areas were temporarily closed, including the new bridge, during the removal of suspension cables and towers on the old bridge, the Iowa DOT said on its website.
“The main navigation channel in the river will be closed to all river traffic for up to 24 hours,” the Iowa DOT said.
In June, the Iowa DOT removed parts of the old I-74 bridge in the first phase of the demolition. The new bridge was built because of “increased traffic volume” the Iowa DOT said.
The westbound bridge, Illinois to Iowa, opened in 1935. The eastbound bridge, Iowa to Illinois, opened in 1960.
The new bridge was built in July 2017 and was fully opened in December 2021.
The project cost about $1 billion in total, including engineering, design and construction costs.
2025-05-01 21:252041 view
2025-05-01 21:021844 view
2025-05-01 20:122630 view
2025-05-01 19:381559 view
2025-05-01 19:362948 view
2025-05-01 19:152039 view
The AP Top 25 college football pollis back every week throughout the season!Get the poll delivered s
It makes sense that someone buying an electric vehicle would also want to buy a charging system and
On a clear and crisp morning, with the sun beating down, Xenrong Ren and Phillip Stratton looked ove